Monday, May 13, 2013

It's May! So Much To Do This Summer!

Welcome back!

Jay is up in Wisconsin working hard, from getting drywall done to painting, putting in lights, getting ready for tile and getting our first load of wood from our trees in.

To start off!

Remember this?! We cut a couple of our older trees down (Below)

Well get ready for this! This is what that wood has been turned into!




Thats only the first load of many!

Continuing along..... We are ready for tile in the kitchen and bathrooms!







We also have Doors!!! They look great also!





We have started the window sills, with the wood from our trees!





I'll try to keep everyone up to date more as the summer goes on! Hope your spring is going well!

Saturday, April 6, 2013

Happy April! It's Still Winter At The Cabin!

Hey everyone! Sorry to not have posted earlier, life has been quite hectic lately!

Anyway! We have many things going on. The drywall is continuing to be finished and the stairs to the basement have been built. Below are the pictures!

We also need opinions! So please follow along and comment!

 ----Master Bedroom
 ------Hallway
------Master Bath Entry

 ------Master Bath Shower

 --------Texture on walls
 ------Stairs to the Basement!
 -----Stairs
 ------Stairs


 -----Wall Texture





So here is where I need YOUR help!!!
here are two pictures. We can decide where the Fridge and Pantry should go. Look at the pictures and Vote on the poll! Thanks!!!

( Click the top left "X" if there is an add on the poll)





Thursday, March 7, 2013

Welcome Back! Happy 2013! Here We Go Again!

Hey everyone! The parents arrived in Spread Eagle yesterday, a little bit early due to some family members not doing too well up there. Any prayers are always greatly appreciated!

But! The construction on the cabin will soon be in full swing. Drywall is the first to go this year! He will be starting in a couple weeks, along with the plumber.

We are still having issues finding water, that will be the first struggle of the project this year. We have to wait till the ground thaws for the drilling truck to come in so something to look forward to in future posts! Anyway, no pictures of the happenings yet but I do have some winter pictures that were just sent to me. Enjoy!

P.S. If you have a gmail account and subscribe to the blog below, you will be updated when new posts are up. Just an idea!

I hope everything is going well for you so far in 2013 and that it will turn out to be a great year!

-Alex




Thursday, November 22, 2012

Final Post For 2012 (Updated By The Builder Himself!)

Welcome back everyone! I hope you're having a great fall and a great thanksgiving today! I set my dad up on the blog tonight and he will hopefully catch you up on everything that has been happening with the cabin! A big thank you from me for following along this year! Have a great winter and very soon we will be back up north to finish up!  Alex
 
The answer to the question posed  on the last post of "will we hit water" is yes, there is more water then what we would need to run a house, but, it is not usable. It is to sandy and mucky to be filtered. Overall depth was 100' for this try. It is much to long of a story to tell in this forum. Let's just say, it was a long and frustrating 4 day process. Another attempt will need to be made next year. Jay spent the last 3 weeks there to get the exterior weather tight for winter, getting the milled lumber from our trees back from the kiln, staining and sealing all the installed exterior siding, some interior framing items, and stocking and hanging all the ceiling sheetrock (subs played a big part in some of those items). Pics are attached to show the sheetrock progress. Mary made her way out of there for her third time this year at the end of Sept. and Jay followed on Oct. 19th. Conventional wisdom and common practice for building "Up North", would be to close the place in with heat and work the interior during the winter. But, multiple events needed our attention back in Denver. The plan as of now is to return to the project sometime next March. Thanks again to the Denver crew that traveled North to help with the framing, all of the support and meals from the locals, Alex for his set up and maintaining this "blog", and many thanks to all of you that followed along from afar. Your interest, comments and compliments meant a great deal during this first phase. We will resume updates as  soon as we can next spring. 
Until then------Jay, Mary, Alex
 
 
 
 







Tuesday, October 16, 2012

Will We Find Water? And Other Projects

Welcome back everyone!! Its been a while since my last post but I finally have found some time to update the blog! A ton has been happening with the building of the cabin and every day it is looking even closer to being done, on the outside at least! Also, as you can tell from the title of this post we are having a tough time finding water. Or at least clean water, we drilled 100' down and found tons of water but its very mucky and we are unable to filter. So on to plan b which is..... No idea yet.... So we'll keep you updated on the water issue as it comes to be! Below are some pictures of the house! All siding is done and even the celling drywall is getting done!